You may track, on an hourly basis, water levels and flows of the recreational rivers and lakes near AEP's hydroelectric facilities. See a map of our plant locations.

Explanation of Terms

  • The "Forebay" and "Tail Water" values shown are the water surface elevation of the lake or river (in feet) immediately upstream and downstream, respectively, of the dam. The elevation datum is National Geodetic Vertical Datum of 1929.
  • "Tail Water Flow (CFS)" is the hourly average of the river flow just downstream of the dams, measured in cubic feet per second.

New River Flows & Forecasts

Water release information for AEP's Claytor, Buck, and Byllesby hydro dams is updated every fifteen minutes. Forecast information is estimated. Water travel times may be affected by water conditions, precipitation in the watershed and other factors.

Most Recent Conditions

ProjectNormal Full PondForebay Actual (Feet)Tail Water (Feet)Tail Water (CFS)
Buck2003.402002.891961.522883
Byllesby2079.202078.832023.063391
Claytor1846.001845.721731.694399
See plant-specific notices below. Data last updated on Oct 14 2026, 7:44 PM EST. Tail water (cfs) is last hour average.

Downstream Forecasts

Forecast information shows water release information from the Claytor Dam, delayed to account for the average time it takes the released water to reach particular points downstream. Water travel times may be affected by water conditions, precipitation in the watershed and other factors.

Kanawha River

ProjectNormal Full PondForebay Actual (Feet)Tail Water (Feet)Tail Water (CFS)
London614.00614.29593.265925
Marmet590.00590.07570.770
Winfield566.00566.47543.060
See plant-specific notices below. Data last updated on Oct 14 2026, 7:44 PM EST. Tail water (cfs) is last hour average.

Roanoke River

ProjectNormal Full PondForebay Actual (Feet)Tail Water (Feet)Tail Water (CFS)
Niagara885.00884.84827.57458.00
Smith Mountain795.00790.86601.89N/A
Leesville613.00.00601.90531.97411
See plant-specific notices below. Data last updated on Oct 14 2026, 7:44 PM EST. Tail water (cfs) is last hour average.

Saint Joseph River

ProjectNormal Full PondForebay Actual (Feet)Tail Water (Feet)Tail Water (CFS)
Constantine782.90782.92771.37–
MottvilleSummer: 770.40
Winter: 770.00
770.43758.681290
Elkhart741.50
winter: 739.50
741.50723.28–
Twin Branch717.10716.96696.402712
BuchananSummer: 637.50
Winter: 637.00
637.51624.702783
Berrien Springs623.50623.41598.683418
See plant-specific notices below. Data last updated on Oct 14 2026, 7:44 PM EST. Tail water (cfs) is last hour average.

Plant–Specific Notices

As of 05:00 this morning, Wednesday October 14, 2026, inflow to the Smith Mountain Project (which includes both Smith Mountain Lake and Leesville Lake) was 1184 CFS and the discharge from Leesville was 410 CFS. The adjusted reservoir elevations was 791.1 ft. The flow rate at the USGS Gauge at Brookneal was 823 CFS, Stage 4.36 ft. and at Altavista 497 CFS, Stage 1.68 ft.