Skip to main content

River Flows for Hydro Plants

You may track, on an hourly basis, water levels and flows of the recreational rivers and lakes near AEP's hydroelectric facilities. See a map of our plant locations.

Explanation of Terms

  • The "Forebay" and "Tailwater" numbers show the feet above sea level of the water levels immediately upstream and downstream from our plants.
  • "Tailwater Flow" is the hourly average of the river flow just downstream of the plants, measured in cubic feet per second.

New River Flows & Forecasts

Water release information for AEP's Claytor, Buck, and Byllesby hydro dams is updated every fifteen minutes. Forecast information is estimated. Water travel times may be affected by water conditions, precipitation in the watershed and other factors.

Most Recent Conditions

ProjectNormal Full PondForebay Actual (Feet)Tail Water (Feet)Tail Water (CFS)
Buck2003.402003.041961.021834
Byllesby2079.202078.762020.872093
Claytor1846.001845.631731.403278
See plant-specific notices below. Data last updated on Feb 23 2026, 11:28 AM EST. Tail water (cfs) is last hour average.

Downstream Forecasts

Forecast information shows water release information from the Claytor Dam, delayed to account for the average time it takes the released water to reach particular points downstream. Water travel times may be affected by water conditions, precipitation in the watershed and other factors.

Kanawha River

ProjectNormal Full PondForebay Actual (Feet)Tail Water (Feet)Tail Water (CFS)
London614.00614.24596.819303
Marmet590.00590.24576.010
Winfield566.00566.35549.596753
See plant-specific notices below. Data last updated on Feb 23 2026, 11:28 AM EST. Tail water (cfs) is last hour average.

Roanoke River

ProjectNormal Full PondForebay Actual (Feet)Tail Water (Feet)Tail Water (CFS)
Niagara885.00885.66
Smith Mountain795.00791.90606.70
Leesville613.00.00606.89532.11419
See plant-specific notices below. Data last updated on Feb 23 2026, 11:28 AM EST. Tail water (cfs) is last hour average.

Saint Joseph River

ProjectNormal Full PondForebay Actual (Feet)Tail Water (Feet)Tail Water (CFS)
Constantine782.90783.65771.81
MottvilleSummer: 770.40
Winter: 770.00
770.43759.542000
Elkhart741.50
winter: 739.50
739.58722.04
Twin Branch717.10716.91696.453603
BuchananSummer: 637.50
Winter: 637.00
637.22625.333756
Berrien Springs623.50623.56598.944757
See plant-specific notices below. Data last updated on Feb 23 2026, 11:28 AM EST. Tail water (cfs) is last hour average.

Plant–Specific Notices

As of 05:00 this morning, Monday February 23, 2026, inflow to the Smith Mountain Project was 2210 CFS and the discharge from Leesville was 418 CFS. The adjusted reservoir elevations was 792.8 ft. The flow rate at the USGS Gauge at Brookneal was 2620 CFS, Stage 6.36 ft. and at Altavista 990 CFS, Stage 2.26 ft.